Stáisiún Huntingdon

Trains running between Sydenham and New Cross Gate may be cancelled, delayed or revised. Latest information can be found in the Disruptions area of the National Rail website.

  1. 10:22 10:32 Peterborough Thameslink · Ardán 3 This service has been delayed by a fault with the signalling system Déanach
  2. 10:40 Horsham Thameslink · Ardán 2 In am
  3. 10:52 10:59 Peterborough Thameslink · Ardán 3 This service has been delayed by a fault with the signalling system Déanach
  4. 11:10 Horsham Thameslink · Ardán 2 In am
  5. 11:23 11:30 Peterborough Thameslink · Ardán 3 This service has been delayed by a fault with the signalling system Déanach
  6. 11:40 Horsham Thameslink · Ardán 2 In am
  7. 11:52 Peterborough Thameslink · Ardán 3 In am
  8. 12:10 Horsham Thameslink · Ardán 2 In am
  9. 12:20 Peterborough Thameslink Amchlár

Nuashonraithe 10:21. Amanna beo laistigh de dhá uair an chloig ó anois.

Powered by National Rail Enquiries

Pleanáil turas as seo