Station Fleet

Trains running to and from London Waterloo may be cancelled or delayed by up to 45 minutes. Latest information can be found in the Disruptions area of the National Rail website.

  1. 07:39 07:41 Van New Malden South Western Railway · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  2. 07:39 07:41 Van New Malden South Western Railway · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  3. 07:46 07:49 Van Southampton Central South Western Railway · Perron 1 This service has been delayed by a late running train being in front of this one Te laat
  4. 08:09 Van New Malden South Western Railway · Perron 2 Op tijd
  5. 08:11 Van Basingstoke South Western Railway · Perron 1 Op tijd
  6. 08:25 Van Portsmouth Harbour South Western Railway · Perron 1 Op tijd
  7. 08:25 Van Portsmouth Harbour South Western Railway · Perron 1 Op tijd
  8. 08:38 Van New Malden South Western Railway · Perron 2 Op tijd
  9. 08:41 Van Southampton Central South Western Railway · Perron 1 Op tijd
  10. 08:49 Van New Malden South Western Railway Op tijd
  11. 09:08 Van New Malden South Western Railway Op tijd
  12. 09:10 Van Basingstoke South Western Railway Op tijd
  13. 09:10 Van Basingstoke South Western Railway Op tijd
  14. 09:26 Van Portsmouth Harbour South Western Railway Op tijd
  15. 09:38 Van New Malden South Western Railway Dienstregeling

Bijgewerkt 07:38. Live tijden tot twee uur vanaf nu.

Powered by National Rail Enquiries

Plan een reis vanaf hier