Station Flitwick

Trains running between Sydenham and New Cross Gate may be cancelled, delayed or revised. Latest information can be found in the Disruptions area of the National Rail website.

  1. 11:40 11:54 Van Brighton Thameslink · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  2. 11:43 Van Bedford Thameslink Dienstregeling
  3. 11:54 12:05 Van Three Bridges Thameslink · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  4. 11:57 Van Bedford Thameslink · Perron 1 Op tijd
  5. 12:10 12:25 Van Brighton Thameslink · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  6. 12:13 Van Bedford Thameslink · Perron 1 Op tijd
  7. 12:24 12:28 Van Three Bridges Thameslink · Perron 2 This service has been delayed by a fault with the signalling system Te laat
  8. 12:27 Van Bedford Thameslink · Perron 1 Op tijd
  9. 12:40 Van Brighton Thameslink · Perron 2 Op tijd
  10. 12:43 Van Bedford Thameslink · Perron 1 Op tijd
  11. 12:54 Van Three Bridges Thameslink · Perron 2 Op tijd
  12. 12:57 Van Bedford Thameslink · Perron 1 Op tijd
  13. 13:10 Van Brighton Thameslink · Perron 2 Op tijd
  14. 13:13 Van Bedford Thameslink · Perron 1 Op tijd
  15. 13:24 Van Three Bridges Thameslink Dienstregeling
  16. 13:27 Van Bedford Thameslink Dienstregeling

Bijgewerkt 11:28. Live tijden tot twee uur vanaf nu.

Powered by National Rail Enquiries

Plan een reis vanaf hier